Skip to main content

Aviation glossary

AMP

Aircraft Maintenance Programme

In short

An AMP (aircraft maintenance programme) sets out every maintenance task for an aircraft and its interval, in flight hours, cycles or calendar time.

Updated

Definition

The aircraft maintenance programme (AMP) organises all maintenance for a given aircraft: tasks, intervals in hours, cycles or calendar time, and tasks linked to the type of operation (M.A.302, ML.A.302). Every aircraft must be maintained in accordance with an AMP.

Under Part-M, the AMP is approved by the competent authority, or by the CAMO or CAO through an indirect approval procedure. It is based on the instructions for continuing airworthiness issued by type certificate and design change holders, and includes the authority’s instructions. For complex motor-powered aircraft, a programme based on MSG logic or condition monitoring must include a reliability programme.

Under Part-ML, the owner declares the AMP when continuing airworthiness is not contracted to a CAMO or CAO; otherwise that organisation approves it. The programme is based on the manufacturer’s instructions or on the minimum inspection programme (MIP), and always includes mandatory items such as repetitive ADs and airworthiness limitations.

What it means for your organisation

An AMP changes with the aircraft. A modification, a repair, new equipment, a manufacturer’s revision or a repetitive AD can add tasks. The programme is reviewed periodically, at least once a year under Part-ML, and amended when experience shows it is needed.

The airworthiness review checks that all maintenance due under the AMP has been done. A gap between the programme and the aircraft’s actual condition, or an interval entered wrongly in the tracking tool, can hold up the ARC.

In GEARUP

GEARUP Naviro tracks the due items that come from the maintenance programme in hours, cycles and calendar time, with configurable alerts ahead of each limit and a forecast based on planned activity. The content and approval of the AMP remain the responsibility of the owner, the CAMO or the CAO.

Frequently asked questions

Under Part-ML, the owner declares it when managing continuing airworthiness alone, without having to send it to the authority. When a CAMO or CAO manages the aircraft, that organisation approves it (ML.A.302).

The AMP is the programme for a specific aircraft. The MIP (minimum inspection programme) is a minimum programme defined in Part-ML, which a light aircraft’s AMP can be based on instead of the manufacturer’s instructions.

Under Part-ML, yes: under the responsibility of the owner who declares the AMP, or with a recorded justification when a CAMO or CAO approves it. Mandatory items remain due, and no task may be less restrictive than the corresponding MIP task.

Official sources

This definition simplifies official texts to make them easier to read. It does not replace the applicable regulation or the opinion of your authority.

Demonstration

See how GEARUP handles this topic.

The demonstration starts from your organisation: your workflows, your roles and the documents you use today.